Forge a random Helm below, or if you own a Loot, Genesis Adventurer or More Loot NFT, claim your helm using the panels above.

The most popular helm, each with between 300 and 400 editions.

Epic Helms have between between 3 and 17 editions.

For each Legendary Helm, there are only 2 editions.

The rarest of the Helms, each Mythic Helm is a 1/1 edition.
Launch (Loot Owners):
Launch (Public):